Resource Hub

Advanced Search

LATEST BROCHURES

  • Minima™ Resolve Composite Frac Plug

    July 1, 2022
    Completions

  • Complete Post-TD Integrated Solutions

    June 30, 2022
    Completions

  • ForeSite Sense Powered by LYTT VSS

    February 15, 2022
    Completions

  • Amplifrac™ Advanced Proppant Suspension Fluid

    August 12, 2021
    Completions

LATEST TECHNICAL SPECIFICATIONS

  • Minima™ Resolve Composite Frac Plug

    June 30, 2022
    Completions

  • A-1 M23 and M24 Casing Cutters

    August 24, 2021
    Aging Reservoirs, Deepwater, Intervention and Abandonment

  • Magnus Rotary Steerable System

    August 2, 2021
    Drilling

  • AccuView Real-Time Remote-Support System

    July 22, 2021
    Intervention and Abandonment

LATEST HIGHLIGHTED CASE STUDIES

  • MPD Technology Drilled 2 Million Feet Safely in HPHT Haynesville Unconventional Shale Play, Reached All Planned Targets in Long-Reach Wells

    Haynesville (East Texas/West Louisiana)

  • MPD Engineering, Planning, 24/7 Support, Real-Time Engineering Enabled Operator to Build Longest Wells Drilled in Canada

    Canada

  • Managed Pressure Drilling Performed Regulator-Approved Dynamic Pore Pressure Test in Deepwater Exploration Well, Redefined Future Well Design

    Gulf of Mexico, USA

  • Universal Permanent Magnet Motor for PCPs Reduces Noise Emissions 38% Energy Usage 9.74% Saves $5K in Electricity and $38K in Annual OPEX

    Romania

LATEST REAL RESULTS

  • MPD Technology Drilled 2 Million Feet Safely in HPHT Haynesville Unconventional Shale Play, Reached All Planned Targets in Long-Reach Wells

    July 15, 2022
    United States

  • Managed Pressure Drilling, Cementing Eliminated Intermediate Contingency Liner in Ultra-Deepwater Well, Saved 5 days, $3.5 Million USD

    July 14, 2022

  • MPD Engineering, Planning, 24-7 Support, Real-Time Engineering Enabled Operator to Build Longest Wells Drilled in Canada

    July 7, 2022
    Canada

  • Managed Pressure Drilling Performed Regulator-Approved Dynamic Pore Pressure Test in Deepwater Exploration Well, Redefined Future Well Design

    June 21, 2022
    United States

LATEST PAPERS

  • UAE's First End to End Standardized Workflow-Based Digital Transformation in a Giant Gas Producing Asset - Lessons Learned and Way Forward

    September 15, 2021

  • Progressing Cavity Pump Stainless Steel Impact in High Corrosive Environments Maximizing Economic Benefits in West Africa - Gabon

    September 15, 2021

  • Geomechanics in Partnership – A Holistic Approach to Solving Drilling Challenges

    September 15, 2021

  • Using Managed Pressure Drilling Equipment to Troubleshoot Well Control Issues with Total Lost Circulation and Ballooning on A Semisubmersible Rig

    September 15, 2021

LATEST MULTIMEDIA

 
We Keep the Ball Rolling
July 10, 2020
 
Mature Field Solutions
April 30, 2020
 
Digitalization and Automation Solutions
April 30, 2020
 
Maximize uptime with ForeSite
April 23, 2020